Arama Yap Mesaj Submit
Request a Callback
+90
X
X

Select Your Currency

₺ Turkish Lira $ US Dollar € Euro
X
X

Select Your Currency

₺ Turkish Lira $ US Dollar € Euro

Contact Us

Location Halkali merkez neighborhood fatih st ozgur apt no 46 , Kucukcekmece , Istanbul , 34303 , TR

Self-Hosted Project Management: OpenProject, Plane, Taiga and Leantime

A comprehensive comparison of OpenProject, Plane, Taiga and Leantime based on data ownership, resource use, security, backup, upgrades and operational cost rather than a feature checklist.

Self-Hosted Project Management: OpenProject, Plane, Taiga and Leantime
Short decision

No single tool fits every organization. Because projects, attachments, time records and workflows are critical, choose by recovery objectives, authorization model and operating capacity—not screenshots or popularity.

In this guide

  1. Decision matrix
  2. Technical option profiles
  3. Production architecture for Self-Hosted Project Management: OpenProject, Plane, Taiga and Leantime
  4. Size from measurements, not guesses
  5. Identity, network and secret controls
  6. The real backup and rollback scope
  7. Pilot, data migration and cutover
  8. Verification commands
  9. Frequently asked questions

Decision matrix

Technical option profilesCapacity planningSecurity controlsBackup and rollback
OpenProjecta lean and fast startMFA · TLS · least privilegeDB · files · secrets · restore test
Planeenterprise process and permissionsMFA · TLS · least privilegeDB · files · secrets · restore test
Taigaintegration-heavy teamsMFA · TLS · least privilegeDB · files · secrets · restore test
Leantimescale and specialized needsMFA · TLS · least privilegeDB · files · secrets · restore test

Technical option profiles

OpenProject

a lean and fast start

Validate the official installation, licensing, backup and upgrade documentation for OpenProject during the pilot.

Plane

enterprise process and permissions

Validate the official installation, licensing, backup and upgrade documentation for Plane during the pilot.

Taiga

integration-heavy teams

Validate the official installation, licensing, backup and upgrade documentation for Taiga during the pilot.

Leantime

scale and specialized needs

Validate the official installation, licensing, backup and upgrade documentation for Leantime during the pilot.

Production architecture for Self-Hosted Project Management: OpenProject, Plane, Taiga and Leantime

Expose only ports 80/443 through a reverse proxy; keep the application, database and queue on a private Docker network or VLAN. Test TLS termination, security headers, rate limits and real-client IP forwarding. OpenProject, Plane, Taiga and Leantime may solve the same category while having different component counts and failure surfaces.

Size from measurements, not guesses

Capacity depends on more than users: concurrency, projects, attachments, time records and workflows, background jobs, indexing and retention alter CPU, RAM and NVMe requirements. Measure p95 latency, peak memory, disk IOPS and daily growth during a pilot, then retain at least 30 percent headroom.

Identity, network and secret controls

Require MFA for administrators, keep a separate emergency account and use SSO where practical. Remove defaults and overprivileged API tokens; store secrets outside the repository. Restrict administration by IP or VPN and export audit logs to a separate target.

The real backup and rollback scope

A database dump alone is incomplete. Back up projects, attachments, time records and workflows, configuration, encryption keys, uploaded files and exact version information as one recovery set. Use 3-2-1 copies, encrypted off-site storage and recurring isolated restore tests.

Pilot, data migration and cutover

Pilot with representative users and verify SSO, email, webhooks, mobile clients and export paths. Document a change freeze, final sync, reduced DNS TTL, acceptance test and rollback threshold. Recheck licensing and extension coverage in official documents before production.

Verification commands

Verification commands 1
docker compose ps
Verification commands 2
docker compose logs --tail 100
Verification commands 3
curl -fsSI https://project.example.com/health
Verification commands 4
df -hT && free -h

Official technical sources

Related EKA Sunucu guides

Frequently asked questions

Which option should I choose?

Score OpenProject, Plane, Taiga and Leantime in a small pilot against your identity, integration, backup and reporting requirements.

What is the minimum server size?

There is no trustworthy universal number. Treat vendor minimums as a starting point and size from pilot measurements plus headroom.

Is Docker suitable for production?

Yes when versions are pinned and persistent volumes, health checks, log collection, backup and controlled upgrades exist.

How should upgrades work?

Read release notes, verify backup, test in staging and preserve a route to the previous image.

How do I prove a backup works?

Restore to an isolated target, sign in, compare record counts and verify sample file integrity.

VPS or dedicated server?

NVMe VPS is practical for many initial deployments; high IOPS, large storage or GPU demand may justify dedicated/GPU infrastructure.

Let us size the deployment

Share the user count, data growth, backup target and expected concurrency so the resources and architecture can be sized.

Explore VPS options Let us size the deployment
Top